Hi all,
I have in synchronization editor a project with 2 workflows.
I run the synchronization in a process step and then I change with an sql query step the workflow attached to it to run the same synchronization with a different workflow.
query to change workflow:
Value = "update DPRProjectionStartInfo set UID_DPRProjectionConfig = (select UID_DPRProjectionConfig from DPRProjectionConfig where DisplayName = 'Workflow 2') where DisplayName = 'SynchProject'"
but when I run the second synchronization I get this error:
ErrorMessages = [2134003] Error executing a full projection!
[1777018] Error executing workflow (SA Import Application Portfolio) of synchronization project (Costa Synchronization).
[1777263] Invalid revision store. The store belongs to another synchronization configuration and cannot be used!
I miss something. Should I update some other table with the workflow to use?
Is not possible to decide programmatically which workflow run in a process step?